Electrical installations
Low-voltage installations for industry, retail and residential buildings, with design, execution and certification.
Power and control panels, conduits, protection, grounding, lighting and upgrades.
From the service entrance to the last load: medium-voltage lines and substations, panels and protection, building systems, and the backup power that takes over when the grid goes down.
Design, installation, commissioning and certification, with our own crews.
Low-voltage installations for industry, retail and residential buildings, with design, execution and certification.
Power and control panels, conduits, protection, grounding, lighting and upgrades.
Service lines, delivery points and transformer stations for plants and buildings.
Pad-mounted transformers, medium-voltage protection, grounding and coordination with the utility.
Sale, installation and commissioning of INMESOL generator sets with automatic transfer, and uninterruptible power supplies (UPS) so that critical equipment never stops, not even for a second.
Salicru and Hannibal voltage stabilizers, filters and surge protection for sensitive equipment. Everything is load-tested before handover.
Self-consumption and hybrid photovoltaic systems with generator and batteries.
Integration of power sources with automatic control, including at hard-to-reach locations.
DAT CONTROLER PLUS early streamer emission lightning rods, enhanced grounding systems and transient surge arresters on the supply, with European equipment bought directly from the factory.
Risk assessment, installation, inspection and remote monitoring of every lightning rod, plus storm detectors.
SteriMed units for treating healthcare waste on site, which we import and distribute in Paraguay.
Supply, installation, commissioning and maintenance. See the dedicated section below.
Import, siting, installation and commissioning of INMESOL gensets, in plant rooms and outdoors, with their automatic transfer switch (ATS) panels.




For Swiss Pharma, we developed the entire automatic fuel supply system for its paralleled generator sets from a bulk supply tank: fuel reaches each genset automatically, and backup power no longer depends on refilling tanks by hand.
In-house design, fabrication, installation and commissioning.
Together with ABB, we built grid-connected photovoltaic solar plants in the Mediterranean: Suggerotortto, Enna, Spinassanta and Catania, in Sicily (Italy), and Abete and Ginestra, in Corsica (France).
For Actelios, in Sicily, we manufactured and installed 15 MW in just two months, a record lead time for the period made possible by the versatility of our driven-pile foundation system.
In Spain we also built the 1 MW Global Capital photovoltaic plants in Totana (Murcia).
That utility-scale solar experience is what we now apply in Paraguay, from grid-connected plants to off-grid hybrid systems with batteries and a generator set.




23,000 V service line and delivery point with a 200 kVA pad-mounted transformer; complete office systems (electrical, emergency, data, video, fire safety and air conditioning) and supply of the emergency generator set.
We also adapted machinery arriving from other countries, with different motors, frequencies and voltages, for use in Paraguay.
Also in: Project development · Construction

Complete maintenance of the 100 and 200 kVA transformers, with dielectric oil replacement and insulation testing; new grounding with graphite electrodes and conductive backfill, designed for low-conductivity clay soil; and renewal of the internal lines with halogen-free cable and concrete poles.
Integration of the grid, solar generation, batteries and generator set, with automatic transfer switching and PLC control.
Lightning protection with lightning rods for the buildings, the facilities and the livestock.
Also in: Water infrastructure · Operation and maintenance



We protect cattle ranches, such as those in Altos (Cordillera) and Santa Ángela (Ybycuí), and high-end homes in areas highly exposed to storms against lightning, safeguarding people, buildings and animals. We have carried out this work in many other places, using practically the full range of equipment from a European manufacturer we have been buying from directly for years.
External protection. DAT CONTROLER PLUS early streamer emission lightning rods, with self-diagnosis and remote status monitoring; air terminals and meshes, and lightning strike counters.
High-conductivity grounding. Copper-bonded steel, copper and graphite electrodes, earth plates and meshes; conductivity enhancers such as Conductiver Gel, conductive cement, graphite and bentonite; inspection pits with test links, equipotential bonding bars and exothermic welding, including in high-resistivity soils.
Surges. The full AT-SUB range of surge arresters, from the AT-SUB 140 down to Type 3 units for fine protection of equipment; permanent overvoltage protection with automatic reclosing; and protection for photovoltaic installations, data and Ethernet lines, telephone, coaxial and CCTV.
Storm detection. Detectors that warn tens of minutes in advance of an approaching thunderstorm, so that people can be kept safe and preventive measures taken in time. Every project starts with a standards-based risk assessment.




New feeder in 95 mm² NYY cable, distribution panel and main switchboard, grounding with copper ground rods and exothermic welding, and 140 kA transient surge protection.
Also in: Construction · Engineering and diagnostics



We are the official INMESOL distributor in Paraguay: equipment, spare parts and factory warranty, with in-house import, siting, installation and commissioning.


SteriMed units shred and disinfect healthcare waste in a single step, in the same hospital, clinic or laboratory where it is generated: no incineration, no steam and no hazardous waste carried across the city. At the end of the cycle the waste is unrecognizable, its volume is reduced by up to 90 % and it can go to landfill as ordinary waste.
They use SterCid, a biodegradable hospital-grade disinfectant, and need only electricity, cold water and a drain. They accept sharps, clinical waste bags, dialysis filters, surgical waste, tissue, blood and laboratory ware.
A building project, an installation or equipment that won't start: write to us and we will reply with an initial assessment, with no obligation.